Groundwater was explored using drilling to a depth of 334 meters to reach a source of fresh water to provide the necessary water to a carbon carton factory, but the study proved that fresh water was not available at this depth, and the well was executed at a depth of 120 meters
Project Location : Abu Zaabal area, Qalyubia governorate